|
West Bloomfield Township - Franklin Sub-Watershed, Tenhill and Wallbrook Extension Drain
The project will consist of the construction of approximately 200 lineal feet of stream bank stabilization along the Franklin Branch of the Rouge River, located in Section 36, West Bloomfield Township. Applied Science, Inc. is the consulting engineer for the project. Gary Nigro, P.E., is the Water Resources Office project engineer assigned to the project. The estimated project cost is $200,000. Construction is scheduled to commence in the spring of 2010. The project will be financed with local funds.
|