|
EFSDS and COSDS Rehabilitation Project
The program consist of the televising and rehabilitation of sanitary sewers and manholes to reduce infiltration and inflow to the sanitary sewer systems. There are several projects being designed under this program. Phillip Sanzica, P.E., Chief Engineer, is the Water Resources Office engineer assigned to the project. A spring 2010 bid date is scheduled. The estimate project cost is $3,000,000. The project is funded by a grant from the EPA with local matching funds. Below are the current projects included in the program: - Bingham Farms inflow and Infiltration - In design
- Troy inflow and Infiltration - In design
- West Bloomfield inflow and Infiltration - Construction to start in February 2012
- Bloomfield Township Lining - Under construction
|