Waterford Township - Clinton-Oakland Sewage Disposal System Walton Boulevard Lining Project


Investigation by WRC staff indicated the severe hydrogen sulfide damage has occurred to the Clinton-Oakland 48” dia. concrete pipe interceptor located along Walton Boulevard, between Silver Lake Road and Telegraph Road, Waterford Township. Wade, Trim Associates, Inc. is the consulting engineer for the project. Glenn R. Appel, P.E., Assistant Chief Engineer, is the Water Resources Office project engineer assigned to the project. The estimated project cost is $500,000. A spring 2010 bid is scheduled. The project  will be financed with existing reserve funds.