West Bloomfield Township - Footing Drain Disconnect Project
The project will consist of sump pump/footing drain disconnects; sanitary sewer and houselead lining and storm drain conveyance systems.
Johnson and Anderson, Inc. is the consulting engineer for the project. Sid Lockhart, P.E. is the Drain Office engineer assigned to the project.
The estimated project cost is $970,000. A summer 2008 bid date is planned. The project is funded by a grant from the EPA.
|