|
City of Southfield - Footing Drain Disconnect Project
The project will consist of the disconnecting of sump pump discharges from combined sewer systems.
The design engineer for the project is CDM, Inc. Sid Lockhart, P.E. is the Drain Office project engineer assigned to the project.
The estimate project cost is $783,000.00. Bids for the project were received on December 11, 2007.
Construction is scheduled to begin in 2008. The project is funded by a grant from the EPA.
|