Franklin Sub-Watershed

Tenhill - Wallbrook Site


The project consisted of channel improvements and streambank stabilization of approximately 300 lineal feet of the Franklin Branch of the Rouge River, located near the outlet of the Edwards Relief Drain in West Bloomfield Township.

Applied Science, Inc. was the consulting engineer for the project. Gary Nigro, P.E. was the Water Resources Commissioner's Office engineer assigned to the project.

Bids for the project were received on December 13, 2005. The construction contract was awarded to Posen Construction, Inc. of Shelby Township, Michigan for their low bid amount of $283,927.53. The project was partially funded by a $105,200.00 grant from the Great Lakes Commission.

The project was completed in the summer of 2007.