You are here:  Drain Office  > Projects  > 
Share this Printer Friendly Version PDF Version Email



 

Bloomfield Township - Footing Drain and Houselead Rehabilitation Project


The project will consist of the televising and relining of approximately 110 sanitary houseleads and the disconnecting of sump pump discharges.

Hubbell, Roth and Clark, Inc. is the consulting engineer for the project. Sid Lockhart, P.E. is the Drain Office project engineer assigned to the project.

The estimate of project cost is $890,000.00. A spring 2008 bid date is scheduled. The project is funded by a grant from the EPA.





County Home   |   Info A-Z   |   Departments   |   Jobs   |   Online Services